After the trial mold, we provide the CMM report according to the tolerance requirements of the drawing to ensure that the part size is within the tolerance range.
09. MATERIAL PROOF
The steel supplier provides the material certificate to us when we purchase the steel.
10. MOLD PACKING AND MOLD
Before mold packaging, we do anti-rust treatment, internal vacuum packaging, outside fumigation-free wooden box.